Total Questions: 80 Questions | Time Duration: 120:00 Minutes
Total Questions: 57 Questions | Time Duration: 120:00 Minutes
Total Questions: 60 Questions | Time Duration: 60:00 Minutes
Total Questions: 49 Questions | Time Duration: 60:00 Minutes
Opening of coal seams: Legal requirement about outlets; locationof outlets; vertical shaft; inclined shaft; inclines; shaft sinking and deepening; drift drivage; mechanized stone drifting; methods of sinking:mechanized sinking in ordinary and water logged grounds, in running sand etc.; freezing, cementation and other special methods; shaft supports, temporary and permanent, tubings, etc., recent developments.
Developments and layout of mines including surface and underground arrangements: Layout and
development of shaft-top, pit-bottom, haulage arrangements, etc.
Underground Mining Methods: Choice of methods of mining coal seams and factors (depth, seam
thickness, inclination, etc.) affecting the same; statutory provisions.
Bord and Pillar method: Schemes of development; design of bord and pillar working; statutory provisions selection of equipment for development - mechanized loaders, continuous miners etc., preparatory arrangement for depillaring; statutory provision for depillaring; designing the system of pillar extraction with caving and stowing; mechanization in depillaring operation; types of loading machines - SDL, LHD, Continuous Miners etc.; roof management; local fall and main fall; indications of roof weighting; air blasts and precautions against the same; precautions against fire and inundation during depillaring; multi-section and contiguous working; liquidation of developed pillars.
Longwall mining: Method of driving single and multiple heading gate roads; longwall face layout -
advancing and retreating faces; orientation of longwall face; support system for longwall gate roads;
powered support; face transfer, operation of shearer and plough; roof management and hard roof
management; periodic and main fall; design of high productive longwall panel; mini/short wall mining; communication and telemonitoring.
Thick seam mining: Board and pillar and longwall methods in multi-section; multi-slice methods; inclined slicing; horizontal slicing and cross slicing in ascending and descending orders; under-winning methods; sublevel caving; integral caving; blasting gallery and descending shield methods; hydraulic mining; special methods of thick seam mining.
Other special methods of mining: Wide stall method; methods of mining thin seams; underground coal gasification, coal bed methane/ coal mine methane etc.
Total Questions: 60 Questions | Time Duration: 60:00 Minutes
Total Questions: 60 Questions | Time Duration: 60:00 Minutes
Total Questions: 60 Questions | Time Duration: 60:00 Minutes
Opencast Mining: Mine Planning, Opening of coal seams and preparation for excavation; box cut, types; selection of site; formation of production benches; ripping; types of rippers; concept of rippability and cycle of operation; drilling; blast hole drills; performance parameters; requirement of number of drills; blasting; blast design; factors influencing blast design; deep hold blasting; calculation of charge per hole; ground vibration; secondary blasting and problems of blasting; side casting; environment friendly non-blasting techniques such as Surface Miners and their safety aspects.
Discontinuous / cyclic methods of excavation and transport: shovel dumper operation; applicability of electric shovel and hydraulic excavators; cycle time and productivity calculation; estimation of equipment fleet; dragline operation; side casting; side cast diagram; calculation of reach; cycle time; productivity calculation; bucket capacity requirement; scrappers; types; methods of work; push pull operation etc.,
Bucket Wheel Excavator - operational methods (lateral block, half block and full block, etc.,) productivity calculation; Surface Miner - operational methods(wide/full base methods, wide/full bench, block mining, stepped cut, empty travel back, turn back and continuous mining methods); conveyors; shiftable and high angle conveyors; mode of operation etc;, OITDS (operator independent truck dispatch system); in-pit crushing and strip-mining; opencast mining over developed coal seams; high-wall mining; safety aspects Construction of Haul roads and ramps: width, super elevation / camber, central bund, side bund, slope, base, sub-base,surface, Surface friction, materials required, drainage, curve, visibility, machines to be used, maintenance, monitoring, Haul road crossings, T-junction, tri-junction, four-way crossings, parameters,
Parking of HEMM, parking of dump trucks, GO-line design, Shelter construction, view point construction.Watering of mine roads for dust suppression, methods to be used, hazards due to overwatering, type of water spraying, spot or strip watering.
Extraction of Methane: Surface to Inseam Methane Drainage, Coal Bed Methane, Abandoned Mine
Methane and Gas content of Coal; Resource and Reserve estimation; Methods of drilling and precautions required while exploration and extraction of methane; Gas production rate, project life and economy; Methods of Collection and conveying/transportation of methane; Installation of extraction wells; Hazards involved.
Total Questions: 60 Questions | Time Duration: 60:00 Minutes
Opencast Mining: Mine Planning, Opening of coal seams and preparation for excavation; box cut, types; selection of site; formation of production benches; ripping; types of rippers; concept of rippability and cycle of operation; drilling; blast hole drills; performance parameters; requirement of number of drills; blasting; blast design; factors influencing blast design; deep hold blasting; calculation of charge per hole; ground vibration; secondary blasting and problems of blasting; side casting; environment friendly non-blasting techniques such as Surface Miners and their safety aspects.
Discontinuous / cyclic methods of excavation and transport: shovel dumper operation; applicability of electric shovel and hydraulic excavators; cycle time and productivity calculation; estimation of equipment fleet; dragline operation; side casting; side cast diagram; calculation of reach; cycle time; productivity calculation; bucket capacity requirement; scrappers; types; methods of work; push pull operation etc.,
Bucket Wheel Excavator - operational methods (lateral block, half block and full block, etc.,) productivity calculation; Surface Miner - operational methods(wide/full base methods, wide/full bench, block mining, stepped cut, empty travel back, turn back and continuous mining methods); conveyors; shiftable and high angle conveyors; mode of operation etc;, OITDS (operator independent truck dispatch system); in-pit crushing and strip-mining; opencast mining over developed coal seams; high-wall mining; safety aspects Construction of Haul roads and ramps: width, super elevation / camber, central bund, side bund, slope, base, sub-base,surface, Surface friction, materials required, drainage, curve, visibility, machines to be used, maintenance, monitoring, Haul road crossings, T-junction, tri-junction, four-way crossings, parameters,
Parking of HEMM, parking of dump trucks, GO-line design, Shelter construction, view point construction.Watering of mine roads for dust suppression, methods to be used, hazards due to overwatering, type of water spraying, spot or strip watering.
Extraction of Methane: Surface to Inseam Methane Drainage, Coal Bed Methane, Abandoned Mine
Methane and Gas content of Coal; Resource and Reserve estimation; Methods of drilling and precautions required while exploration and extraction of methane; Gas production rate, project life and economy; Methods of Collection and conveying/transportation of methane; Installation of extraction wells; Hazards involved.
Total Questions: 60 Questions | Time Duration: 60:00 Minutes
Opencast Mining: Mine Planning, Opening of coal seams and preparation for excavation; box cut, types; selection of site; formation of production benches; ripping; types of rippers; concept of rippability and cycle of operation; drilling; blast hole drills; performance parameters; requirement of number of drills; blasting; blast design; factors influencing blast design; deep hold blasting; calculation of charge per hole; ground vibration; secondary blasting and problems of blasting; side casting; environment friendly non-blasting techniques such as Surface Miners and their safety aspects.
Discontinuous / cyclic methods of excavation and transport: shovel dumper operation; applicability of electric shovel and hydraulic excavators; cycle time and productivity calculation; estimation of equipment fleet; dragline operation; side casting; side cast diagram; calculation of reach; cycle time; productivity calculation; bucket capacity requirement; scrappers; types; methods of work; push pull operation etc.,
Bucket Wheel Excavator - operational methods (lateral block, half block and full block, etc.,) productivity calculation; Surface Miner - operational methods(wide/full base methods, wide/full bench, block mining, stepped cut, empty travel back, turn back and continuous mining methods); conveyors; shiftable and high angle conveyors; mode of operation etc;, OITDS (operator independent truck dispatch system); in-pit crushing and strip-mining; opencast mining over developed coal seams; high-wall mining; safety aspects Construction of Haul roads and ramps: width, super elevation / camber, central bund, side bund, slope, base, sub-base,surface, Surface friction, materials required, drainage, curve, visibility, machines to be used, maintenance, monitoring, Haul road crossings, T-junction, tri-junction, four-way crossings, parameters,
Parking of HEMM, parking of dump trucks, GO-line design, Shelter construction, view point construction.Watering of mine roads for dust suppression, methods to be used, hazards due to overwatering, type of water spraying, spot or strip watering.
Extraction of Methane: Surface to Inseam Methane Drainage, Coal Bed Methane, Abandoned Mine
Methane and Gas content of Coal; Resource and Reserve estimation; Methods of drilling and precautions required while exploration and extraction of methane; Gas production rate, project life and economy; Methods of Collection and conveying/transportation of methane; Installation of extraction wells; Hazards involved.
Total Questions: 60 Questions | Time Duration: 60:00 Minutes
Total Questions: 60 Questions | Time Duration: 60:00 Minutes
Application of concepts of Rock Mechanics for designing the methods of mining and strata control:
Theories of ground movement and strata control; stress, strain - compressive and tensile, shear strength uniaxial and tri-axial strength, Poissons Ratio, Youngs Modulus, convergence, elasticity, lithostatic and hydrostatic pressure; rock mass classification, strength of stooks; shaft pillar; protection of surface structures; design and stability of structures in rock; rock mass rating, design of support and reinforcement for underground excavations and open pits, support resistance, yielding and non-yielding supports, dynamic and static loading, measuring instruments, consolidated and unconsolidated fills, rock bolts, cable bolts, wire mesh, latest developments in mine supports, economics of support design, subsidence; caving of rock mass; bumps; monitoring of rock mass performance; roof management, mechanics of rock fragmentation; monitoring of rock mass performance, Types of bench and dump slope failures, Theories of ground movement and strata control, ; Dump types, internal and out of pit dumps, Dump construction, size, shape, Site selection and preparation for dumping, Methods of dumping, machines required for dump construction, consolidated and unconsolidated dumps, slope stability; slope angle, benches, berms, factors affecting slope stability, design criteria and monitoring systems; dump stability; dump management.
Total Questions: 50 Questions | Time Duration: 60:00 Minutes
Total Questions: 150 Questions | Time Duration: 180:00 Minutes
Total Questions: 150 Questions | Time Duration: 180:00 Minutes
Total Questions: 150 Questions | Time Duration: 180:00 Minutes
Total Questions: 100 Questions | Time Duration: 120:00 Minutes
Total Questions: 150 Questions | Time Duration: 180:00 Minutes
Total Questions: 149 Questions | Time Duration: 180:00 Minutes
Total Questions: 93 Questions | Time Duration: 120:00 Minutes
Total Questions: 149 Questions | Time Duration: 180:00 Minutes
Total Questions: 150 Questions | Time Duration: 180:00 Minutes
Total Questions: 150 Questions | Time Duration: 180:00 Minutes
Total Questions: 149 Questions | Time Duration: 180:00 Minutes
Total Questions: 149 Questions | Time Duration: 180:00 Minutes
Total Questions: 150 Questions | Time Duration: 180:00 Minutes
Total Questions: 150 Questions | Time Duration: 180:00 Minutes
Total Questions: 150 Questions | Time Duration: 180:00 Minutes
Total Questions: 100 Questions | Time Duration: 120:00 Minutes
Total Questions: 96 Questions | Time Duration: 120:00 Minutes
Total Questions: 150 Questions | Time Duration: 180:00 Minutes
Total Questions: 150 Questions | Time Duration: 180:00 Minutes
Total Questions: 150 Questions | Time Duration: 180:00 Minutes
Total Questions: 150 Questions | Time Duration: 180:00 Minutes
Total Questions: 150 Questions | Time Duration: 180:00 Minutes
Total Questions: 150 Questions | Time Duration: 180:00 Minutes
Total Questions: 150 Questions | Time Duration: 180:00 Minutes
Total Questions: 150 Questions | Time Duration: 180:00 Minutes
Total Questions: 150 Questions | Time Duration: 180:00 Minutes
Total Questions: 150 Questions | Time Duration: 180:00 Minutes
Total Questions: 100 Questions | Time Duration: 120:00 Minutes
Total Questions: 98 Questions | Time Duration: 120:00 Minutes
Total Questions: 99 Questions | Time Duration: 120:00 Minutes
Total Questions: 70 Questions | Time Duration: 60:00 Minutes
Total Questions: 60 Questions | Time Duration: 60:00 Minutes
Total Questions: 70 Questions | Time Duration: 60:00 Minutes
You need to PayTm/Gpay/PhonePe the discounted test series fee directly to our Paytm/GPay/PhonePe No- 8804777500
After payment whatsapp us on 8804777500 - your name, email id, test series name.Test series will be activated within 45 minutes from our end.
SYLLABUS FOR THE EXAMINATION FOR SECOND CLASS MANAGER'S CERTIFICATE OF COMPETENCY (UNDER COAL MINES REGULATIONS, 2017)
Geology: Nature and occurrence of coal seams; description of Indian coalfields; geological features of coalfields; methods of boring, boring through disturbed strata; bore hole survey; interpretation of geological maps.
Opening of coal seams: Shaft sinking and drift drivage; methods of sinking; mechanized sinking, in ordinary and water-logged grounds and other special methods; shaft supports, temporary and permanent; mechanized stone drifting, etc.
Developments and layout of mines including surface and underground arrangements: Layout and development of shaft-top and pit-bottom and haulage arrangements.
Underground Mining Methods: Choice of methods of mining coal seams and factors (depth, seam thickness, inclination, etc.) affecting the same; statutory provisions.
Board and Pillar Method: Design of board and pillar working; statutory provisions, mechanized loaders, continuous miners, etc.; depillaring and applicable statutory provision; pillar extraction with caving and stowing; mechanization in depillaring; local fall and main fall; indications of roof weighting; air blasts and precautions against the same; precautions against fire and inundation during depillaring; multi-section and contiguous working; liquidation of developed pillars.
Longwall mining: Method of driving single and multiple heading gate roads; orientation of longwall face; advancing and retreating faces; orientation of longwall face; support system for longwall gate roads; powered support; face transfer; operation of shearer and plough; periodic and main fall; mini/short wall mining; communication and telemonitoring.
Thick seam mining: Board and pillar and longwall methods in multi-section; multi-slice methods; inclined slicing; horizontal slicing and cross slicing in ascending and descending orders; under-winning methods; sublevel caving; integral caving; blasting gallery and descending shield methods; hydraulic mining; special methods of thick seam mining.
Other special methods of mining: Wide stall method; methods of mining thin seams; underground coal gasification, coal bed methane/coal mine methane, etc.
Opencast Mining: Opening of coal seams and preparation for excavation; box cut, types; selection of site; layout of opencast mine, parameters, formation of production benches; ripping; types of rippers; cycle of operation; construction of haul roads and ramps, width, super elevation/camber, central bund, side bund, slope, base, sub-base, surface; surface friction, materials required, drainage, curve, visibility, machines to be used, maintenance, monitoring, haul road crossings, T-junction, tri-junction, four-way crossings, parameters; parking of HEMM, parking of dump trucks, GO-line design, shelter construction, view point construction; watering of mine roads for dust suppression, methods to be used, hazards due to overwatering, type of water spraying, spot or strip watering.
Drilling: Blast hole drills, performance parameters; requirement of the number of drills; blasting; blast design; factors influencing blast design; deep hole blasting; calculation of charge per hole; ground vibration; secondary blasting and problems of blasting; environment-friendly non-blasting techniques; safety aspects.
Discontinuous/cyclic methods of excavation and transport: Shovel dumper operation; applicability of electric shovel and hydraulic excavators; cycle time and productivity calculation; estimation of equipment fleet; dragline operation; dragline balancing diagram; side casting; calculation of reach; cycle time; productivity calculation; bucket capacity requirement; scrapers; types; methods of work; push-pull operation, etc.; Bucket Wheel Excavator-operational methods (lateral block, half block, and full block, etc.); productivity calculation, continuous surface miner-operational methods (wide/full base methods, wide/full bench, block mining, stepped cut, empty travel back, turn back, and continuous mining methods); conveyors: shiftable and high angle conveyors; mode of operation, etc.; OITDS (operator independent truck dispatch system); in-pit crushing, coal handling plants, strip mining; opencast mining over developed coal seams; high-wall mining; safety aspects.
Application of concepts of Rock Mechanics for controlling the methods of mining and strata control: Theories of rock mechanics applicable to design and layouts of coal mines; pillar strength estimation;
Structures: Design and stability of structures in rock; design of support and reinforcement for underground excavations and open pits, roof management, consolidated and unconsolidated fills, rock bolts, cable bolts, subsidence; caving of rock mass; bumps; monitoring of rock mass performance; mechanics of rock fragmentation; dump types, internal and out of pit dumps; dump construction, size, shape, site selection and preparation for dumping; methods of dumping, machines required for dump construction, slope stability; slope angle, benches, berms, factors affecting slope stability, design criteria and monitoring systems; dump stability; dump management.
Use and safe handling of explosives: Blasting techniques and their relative efficiency, total cost concept and safety precautions.
Danger from different sources of water: Precautions to prevent inundation, siltation, bench and dump failures; designing drainage systems, calculation of catchment area, sump and pump capacity, water dams, retaining walls, siltation ponds, gabion walls, water danger plans.
CLICK ME TO DOWNLOAD THE PDF OF SECOND CLASS UNRESTRCITED WINNING & WORKING DGMS EXAM SYLLABUS